Public announcement of social stability risk analysis and investigation

2023-12-05

Jiangxi Golden Triangle Ceramics Co., Ltd
The entire line introduces an intelligent ceramic rock natural gas production line with an annual production capacity of 10.56 million square meters from Italy
Public announcement of social stability risk analysis and investigation

 

According to the Notice of the National Development and Reform Commission on the Interim Measures for Social Stability Risk Assessment of Major fixed assets investment Projects (FGTZ [2012] No. 2492), the Notice of the General Office of the National Development and Reform Commission on Printing and Distributing the Outline of Social Stability Risk Analysis Chapter and Assessment Report Preparation of Major fixed assets investment Projects (for Trial Implementation) (FGBTZ [2013] No. 428) Entrusted by Jiangxi Golden Triangle Ceramics Co., Ltd, Jiangxi Boxing Project Consulting Co., Ltd. has prepared a social stability risk analysis report for the introduction of an intelligent ceramic rock natural gas production line with an annual output of 10.56 million square meters from Italy by Jiangxi Golden Triangle Ceramics Co., Ltd. The relevant matters of the social stability risk analysis for this project are now publicly disclosed as follows:

  • Project Summary

1、Project Name: Jiangxi Golden Triangle Ceramics Co., Ltd. Introduces an intelligent ceramic rock natural gas production line with an annual output of 10.56 million square meters from Italy for the entire production line;

2、Project nature: Technical renovation;

3、Project construction address: within the factory area of Jiangxi Golden Triangle Ceramics Co., Ltd. in Yangwei Town Industrial Project Area, Gao'an, Jiangxi Province;

4、Total investment: The total investment of this project is 100 million yuan, with funding sources of 30 million yuan raised by the enterprise and 70 million yuan from bank loans;

5、Project schedule: 2020-2022

6、Project Progress: The Environmental Impact Assessment (EIA) report, Energy Assessment (EIA) report, and Safety Assessment (SA) report with the project registration number (Unified Project Code: 2020-360983-30-03-036737) are currently being prepared and approved.

二、Main construction content:

Scale: Construct two intelligent and high-end rock slab production lines with an annual total output of 10.56 million square meters, replacing two antique brick and architectural ceramic production lines with an annual output of 10.56 million square meters in Phase 1;

Product plan: Production of 10000 * 20000, 12000 * 24000, 16000 * 32000 rock slabs;

Main equipment purchased: 32 sets.

  • Name and contact information of the construction unit

(一)Construction unit: Jiangxi Golden Triangle Ceramics Co., Ltd;

(二)Mailing address: Industrial Park, Gao'an City, Yichun City, Jiangxi Province (Yangwei Town Industrial Project Area);

(三)Contact person and contact information: Liu Jianping13576545138;

  • Report preparation unit and contact information
  • Unit name: Jiangxi Boxing Project Consulting Co., Ltd;

(二)Mailing Address: A1 # Office Building, Greenland Central Plaza, No. 998 Honggutan Avenue, Honggutan New District, Nanchang City, Jiangxi Province -4802

(三)Contact person: Chen Gong;18897919856;       

(四)Email:1484856271@qq.com

  • Main matters for soliciting public opinion

(一)What is your attitude towards the construction of this project (please explain the reasons for support and opposition, as well as your opinions or suggestions on this project)?

(二)What do you think of the current environmental quality situation in the project location and what is your opinion?

(三)What do you think are the main social stability risks of this project?

(四)What impact do you think the construction of this project will have on your quality of life?

(五)What do you think the impact of this project construction on the local socio-economic development?

  • The timing and possible ways for the public to express their opinions

Within 10 working days from the date of public announcement, feedback can be provided in writing to the construction unit or the project social stability risk analysis report preparation unit through letters, emails, and other means.

 

Jiangxi Boxing Project Consulting Co., Ltd

May 6th, 2021